| S# |
CLIENT NAME |
DESCRIPTION OF WORK |
YEAR |
| 01 |
NATIONAL KHARAFI |
Fire fighting piping work with sprinkler system at arrya centre, shuwaikh, Kuwait |
2002 |
| 02 |
ABB UTA SERVICES
DOHA POWER STATION
|
Fencing, sheet roofing , and gardening work in Doha power station, Kuwait |
2002 |
| 03 |
SATI AL SHAMCE |
Expansion of Al-Tameer building (KOC project) |
2002 |
| 04 |
UB ENGINEERING LTD. |
Demolition and disposal of temporary facilities |
2002 |
| 05 |
KHARAFI NATIONAL CO |
Chiller and pump erection, FCU and AHU piping connection at Arrya centre project |
2002 |
| 06 |
MINISTRY OF DEFENSE |
Excavation and re-placement of existing drain pipe and installation of new one |
2002 |
| 07 |
KHARAFI NATIONAL CO |
Chiller and pump erection, FCU and AHU connection & Firefighting piping at Salmia water front project. |
2002 |
| 08 |
ABB UTA SERVICES
DOHA POWER STATION |
Manpower Supply, Maintenance work, in Doha power station,
Kuwait |
2002-2003 |
| 09 |
PUBLIC WAREHOUSING COMPANY |
Manpower supply to Sulaibiya ware house for maintenance work |
2003 |
| 10 |
PUBLIC WAREHOUSING COMPANY |
Replacement of roof drain way (gutter) on 18 nos. Warehouses |
2003 |
| 11 |
UB ENGINEERING LTD. |
Installation of crusher unit, gear box, motor etc. In Kuwait cement company. |
2003 |
| 12 |
GULF ENGINEERING |
30" dia piping headers along with 9 nos. Cooling tower connection and 9 nos. Cooling towers erection |
2003 |
| 13 |
LEADERS ALUMINIUM GLASS IND.SHARJA, UNITED ARAB EMIRATES
|
Installation of aluminum and glazing works for KOAC project in Shuwaikh, Kuwait. |
2003 |
| 14 |
LEADERS ALUMINIUM GLASS IND.SHARJA, UNITED ARAB EMIRATES
|
Installation of aluminum & glazing works including ACP cladding in KFAS center for research and treatment of diabetics, Kuwait |
2003 |
| 15 |
UB ENGINEERING LTD.
|
Supply of manpower for Az- zour Gas Turbine Project |
2004 |
| 16 |
BEHABANI NATIONAL GROUP KUWAIT
|
Erection of chiller, pumps , FCU, AHU connection, fabrication & erection of chiller connections at military engineering bldg. At Jahra ( MOD) |
2004 |
| 17 |
ABDUL HAMID AL-ESSA CO
|
Dismantling and erection of chiller units in Kuwait university
building, Shuwaikh |
2004 |
| 18 |
FIRST KUWAITI CO.
|
Supply of Catering Services, at Subiya Power Station Project. Joint venture with Kiran International Co. |
2004-2005 |
| 19 |
FIRST KUWAITI CO.
|
Supply of Catering Services, at Subiya Power Station Project. Joint venture with Kiran International Co. |
2004-2005 |
| 20 |
FIRST KUWAITI CO.
.
|
Supply of Equipment, at Subiya Power station Project. Joint venture with Kiran International Co |
2004-2005 |
| 21 |
AL-MUNTASER GEN. TRD. & CONT. CO.
|
Manpower supply to PIJV Al Fatha River Crossing project. Kirkuk Iraq |
2005 |
| 22 |
NATIONAL COMPANY FOR MECHANICAL &
ELECTRICAL WORKS LTD.
|
Installation and Testing and Commissioning of HVAC Works at Qibla , Annex Building, Maliya, Kuwait |
2006 |
| 23 |
NATIONAL COMPANY FOR MECHANICAL &
ELECTRICAL WORKS LTD.
|
Modification of Condenser and & Chilled Water Pipes at Liberation Tower Complex, Kuwait |
2006 |
| 24 |
NATIONAL COMPANY FOR MECHANICAL &
ELECTRICAL WORKS LTD.
|
Installation & Testing of HVAC Systems for Building No.1~ 13 at KOC Office Complex, |
2006 |
| 25 |
FIRST KUWAITI CO.
|
Supply of Catering Services, at Subiya Power Station Project. Joint venture with Kiran International Co. |
2006-2007 |
| 26 |
FIRST KUWAITI CO.
.
|
Supply of Manpower, at Subiya Power Station Project. Joint venture with Kiran International Co. |
2006-2007 |
| 27 |
GULF SPECIALIZED MECH &
ENG. SERVICES CO. L.L.C.,
|
Painting of Evaporator Stage 1~23 and De aerator at Sabiya Distillation Plant & Re carbonation System |
2007-2008 |
| 28 |
CHINA HARNOUR ENGINEERING CO.
|
Designing and Construction of Labour Camp and Site Office, at Bubiyan Project. |
2008 |
| 29 |
AL- HASOUN SEJONG ELECTRO MECH. CO.
|
Supply of Manpower, KUSU-SCA-E-001 Project, Shuaiba New
Sub-station, Kuwait |
2008 |
| 30 |
HYUNDAI ENGINEERING LIMITED
|
Supply of Manpower, Shuaiba Power Station Kuwait |
2008 |
OUR ENGINEERS PREVIOUS INVOLVEMENTS IN VARIOUS PROJECTS ARE GIVEN BELOW FOR YOUR REFERENCE.
OIL SECTOR:
Civil Contracting (1977-1979) We completed with IHI JAPAN BS 130, 140, 150 boosting stations complete civil works. Gathering centers from GC- 1 to 25 all piping works, flare stacks erection and foundation works, burn pits and its allied piping work. Fencing around oil wells, pipe supports with its foundation.
KNPC TANK FARM SUBHAN (LOCAL MARKETIN2 DEPOTS TANKS) YEAR 1979-80:
Tank foundation: tank erection & allied pipe works with all civil works we completed on workmanship basis.
BUNKERIN2 TANKS IN SHUAIBA —PERIOD OF CONTRACT 1979-80
We completed Tank foundation and pipe works.
MINISTRY OF COMMUNICATIONS 1988-1990
Joint Venture with Electrim, Poland.
Excavation, pipe laying, cable laying, -cable jointing, manhole construction, hand hole construction, repair of ducts. In addition to that, we did road crossing duct laying by cutting Asphalt and concrete encasement up to 20 way ducts.
Water Proofing Work 1988-1989
Replacement of small Boat Harbour at Mina Al-Ahmadi for K.O.C
Construction of New training offices at Burgan for K.O.C
Water-proofing work for Housing Authority in Dhahar Area.
Safety Fences 1987-1986
Around Doha East and West Power Station, Mina Ahmadi & Shuaiba , Mina Abdullah, Refineries with Marafi & Jarfan Cont. Company.
U.S. Army Camp Doha, Al-Salem & Al-Jaber Air Base 1997-1998
Executed construction and fabrication of Security Guard Tower 8 Nds. at Camp Doha for US Army with MIS Waled Al Wazzan Company.
Executed construction of office storage space and workshop at Building No.22 in Camp Doha with M/s. Waled Al-Wazzan Company.
Refinery Modernization Projects with TAIZEE & JGC CORP. JAPAN -Period of Contract 1982-1984
We completed fireproofing, concrete and foundation works.
For Ministry of Electricity & Water
Water distribution projects stage JIB with IHI JPAN 185 Kms. From Mutala to Nuwaisib ductile iron pipe 150mm dia. 1200 mm dia. 1980-1982 Mina Al-Zoor south power station project period of contract 1984-1988. With Shimizu Corp. Japan, we have finished the switchgear foundation, pilling, pipe and pile breaking in addition to that, we have completed turbine foundation, block works or turbine building in Al Zour South Power Station. Overhead line from Doha to Jabria — Period of Contract 1980- 82. And we have carried out the tower line from Doha Power Station till Jabria with Frate Geom Bruno, Italy.
Manpower Supply - Skilled and Unskilled for the following:
Prior to Iraqi invasion in Kuwait, we supplied more than 1200 labours for various projects in Kuwait. Some of the references are given below: • Toyo Eng. Japan & India Ltd. For K.O.C. Project. • Shimizu Corporation, Mina Al-Zoor Project. • Mitsubishi Heavy Industries, Mina Al-Zoor Project. • Hitachi Al-Ghanim, Mina Al-Zoor Project. • Western India, Doha & Al-Zoor Power Station Project. • Toshiba Industries Doha & Al-Zoor Power Station Project. • Atesco wood group for KNPC Project. • Gingi Keer at Al-Zoor Power Station Project.
Construction of and fabrication of Telecommunication shelter at Building No.22 — Camp Doha through Mutual Telecommunication Inc. U.K. 1998-1999.
Construction and erection of section guard tower - 3 Nos. at Al- Salem Airbase with US Air Force. 1999.
Rehabilitation works of US army offices, Mess hall and chapel at 6th Brigade at Al-Muthala, with I\41S. Waled Al-Wazzan Company. 1999-2000.
Replacing and re-fixing of paver, curbstone at US Army Camp at North Doha Camp with M/S Waled Al-Wazzan Company. 1991- 2000.
Pre-fab. Camps
We have completed a 900 persons camp with all facilities in Subiya Power Station Project for U.B Engineering India Ltd. Also we have completed another 220 person capacity camp in Subiya Power Project for I.S.Co. 1995- 1996. We have completed all temporary facilities and site offices for K.N.P.C. and C. H. E. C in Shuiaba for their project of full restoration of Shuaiba Oil Pier.l996- 1997. Constructed labour camp in Subiya for M.H.I., Sub-Contractor with a capacity of 260 persons. 1997-1998. Construction of Engineers’ residence at Rowdatain with Dalem Engineers and contracting Co.2000. We completed 600 persons camp in Mina Abdulla for M/S. Sultaniya Group.2000. We have completed Roofing Concrete, Water proofing and Terrazzo tiling of boiler unit 1-4 in Subiya Power Station. 1999- 2000. We have completed following works with MIs Mushref Trading Cont. for the project at SE-59-Abdally. 2002-2004. Pre cast Manholes Cast in citu Manholes Thrust Blocks for 200 mm dia to 400 mm dia PVC Pipe. Thrust Blocks for 500 mm dia to 1200 mm dia Pipes. At present we are doing a camp constriction of CHEC for 1500 worker in Subiya for Bubiyan See port Project also we are doing the construction work of shuiba Power station Project with Messer’s Hyundai construction Co. |
|